Top Of The World
The layout and staking of a parking lot and the start of our site paving operation.
After completion of a pour, the start of the layout of control joists with the specified time by the specifications.
Early morning pour to alleviate the traffic of the city.
Raising Cane’s: the commencing of the pour
Tilt Wall poured on site and erected within 7.
Industrial Red Diamond pour in Mat Roofing. Prior to pour, 2nd retaining wall.
Suspended CIP Grade Beams sitting on Auger Cast Piles @ 70’-0” deep.
Pour at Pan Stairs.